System Operating Orders
Our operating procedures enable the safe, reliable and efficient operation of the power system. We develop operating procedures in consideration of safety standards, industry reliability criteria, equipment capabilities and environmental obligations. We develop operating procedures using simulations of the power system.
Digital copies of the System Operating Orders are no longer available on our website. They can now be accessed via the BCRC Extranet website. If you do not have access to the BCRC Extranet, please email TDSO.Compliance@bchydro.com with your reasons for needing this information.
Policy and Standards Orders
Number |
Title |
---|
SOO 1T-22 |
Outage Scheduling and Coordination |
Number |
Title |
---|
SOO 5T-10 |
Ratings For All Transmission Circuits 60 kV Or Higher |
SOO 5T-14 |
Ratings for All Transmission and Distribution Transmformers |
SOO 7T-22 |
System Voltage Control |
Number |
Title |
---|
SOO 7T-13 |
G.M. Shrum / Peace Canyon 500 kV System |
SOO 7T-13 Att 4 |
7T-13 Attachment 4 ILM 500 kV System Operation |
SOO 7T-13 Att 6 |
7T-13 Attachment 6 ILM 500 kV System Operation |
SOO 7T-14 |
Bridge River - Lower Mainland Interconnection |
SOO 7T-14 Att 1 |
Bridge River - Lower Mainland Interconnection Generation Shedding Requirements |
SOO 7T-17 |
BC - Alberta Interconnection |
SOO 7T-18 |
BC - US Interconnection |
SOO 7T-25 |
Bridge River 1 - Seton - Carquille - 100 Mile House 60 kV Operation |
SOO 7T-30 |
North Coast Interconnection |
SOO 7T-33 |
South Interior Subsystem |
SOO 7T-34 |
South Interior Generation Shedding and Outage Requirements |
SOO 7T-34 Att1 |
SI 500 kV Operation (2L277 Connected to NLY)
|
SOO 7T-34 Att2 |
SEL 230 kV / 500 kV Operation (2L277 Connected to NLY) |
SOO 7T-35 |
Peace 138/230/500 kV Network Operation |
SOO 7T-40 |
Cheekye-Dunsmuir 500 kV System |
SOO 7T-41 |
Vancouver Island System Operation |
SOO 7T-62 |
Unscheduled Flow (USF) Reduction Procedure |
SOO 7T-64 |
Rotational Energy to Support Transfer Limits |