Requirements for upgrades made on or before September 30, 2023
Program details sometimes change
The Home Renovation Rebate Program details can change slightly over time (no more than twice per year) based on factors like changing industry standards, customer participation and more. The information on our website reflects the current program requirements, but if a program change overlaps with your renovation project, we determine your eligibility based on the program requirements that were in effect as of your project invoice date.
Previous requirements
Upgrades with invoices dated between July 1, 2023 to September 30, 2023 are eligible to apply for rebates per the previous requirements outlined in the previous program eligibility [PDF, 236 KB] and terms and conditions [PDF, 78.1 KB].
Upgrades with invoices dated June 30, 2023 or earlier must meet the minimum electricity consumption requirement that was effective October 1, 2020 to June 30, 2023, per the requirements noted in the previous eligibility [PDF, 236 KB] and terms and conditions [PDF, 153 KB].
Upgrades with invoices dated between October 1, 2022 and March 31, 2023 are eligible to apply for rebates per the previous requirements below, as well as the program eligibility [PDF, 390 KB] and terms and conditions [PDF, 126 KB].
Insulation rebate requirements for invoices October 1, 2022 to March 31, 2023
Location of insulation upgrade | Rebate per sq. ft. | Minimum R-value of new insulation to be added | Rebate maximum | Bonus eligibility |
---|---|---|---|---|
Attic - flat and cathedral ceiling | $0.02 | R12 | $900 | Each location that achieves a minimum $500 rebate qualifies as one bonus-eligible upgrade |
Exterior wall cavities | $0.09 | R12 | $1,200 | |
Exterior wall sheathing | $0.09 | R3.8 | $1,200 | |
Basement/crawlspace wall* | $0.09 | R10 | $1,200 | |
Other (exposed floor, floor over crawlspace*, basement header) | $0.07 | R20 | $1,000 | Not bonus-eligible |
*One rebate for basement/crawlspace walls or floor over crawlspace |
Refer to insulation rebate requirements [PDF, 390 KB] for upgrades invoiced between October 1, 2022 and March 31, 2023.
Window and door rebate requirements for invoices October 1, 2022 to March 31, 2023
Upgrade | Rebate | U-Factor (As indicated on the product label) | Rebate maximum | Bonus eligibility |
---|---|---|---|---|
Tier 2 window/door | $100 each | 1.22 (W/m2-K) or less | $2,000 | Minimum of $250 rebate achieved qualifies as one bonus-eligible rebate |
*Homes within the City of Vancouver municipal boundary are not eligible for Tier 2 rebate. |
Refer to the windows and doors rebate requirements [PDF, 390 KB] for upgrades invoiced between October 1, 2022 and March 31, 2023.
Upgrade | Rebate | Efficiency requirements | nus eligibility |
---|---|---|---|
Ductless mini split heat pump (serves one zone) | $1,000 | SEER ≥ 16; HSPF (Region IV) ≥ 10 | Qualifies as one bonus-eligible rebate |
Ductless multi-split heat pump (serves multiple zones) | $1,000 | SEER ≥ 16; HSPF (Region IV) ≥ 10 | Qualifies as one bonus-eligible rebate |
Central ducted heat pump (serves multiple zones) | $2,000 | SEER ≥ 16; HSPF (Region IV) ≥ 10 | Qualifies as one bonus-eligible rebate |
Refer to the heat pump rebate requirements [PDF, 390 KB] for upgrades invoiced between October 1, 2022 and March 31, 2023. To view the eligible heat pump product list during this period, select from the following: ductless mini-split heat pumps [PDF, 2.2 MB], ductless multi-split heat pumps [PDF, 966 KB], central ducted heat pumps (Tier 1) [PDF, 2.7 MB], and central ducted heat pumps (Tier 2) [PDF, 2.9 MB].
Water heater rebate requirements for invoices October 1, 2022 to March 31, 2023
Upgrade | Rebate | Rebate maximum | Bonus eligibility |
---|---|---|---|
Heat pump water heater | $1,000 | Maximum one primary water heating system rebate per home, as part of the Home Renovation Rebate Program, regardless of the number of systems installed. | Qualifies as one bonus-eligible rebate |
Refer to the heat pump water heater rebate requirements [PDF, 390 KB] for upgrades invoiced between October 1, 2022 and March 31, 2023.
Program terms and conditions [PDF, 125 KB] for upgrades invoices between October 1, 2022 and March 31, 2023.
If you have questions about your application, contact our team at 1-800-BCHYDRO (1 800 224 9376).