Paths, roads & parks
Paths can be built under high voltage lines, with our consent
Outdoor recreation paths, roads, biking trails and walkways can be built under high voltage overhead lines, subject to our review. Always seek to orient a path or trail alignment at least six metres (20 feet) away from our towers or other works.
We’ll review proposed trails to ensure crews can still access the equipment for maintenance. ROW must still be accessible by large trucks or tracked machinery, and we reserve all rights for future rebuilding of access roads over top of installed trails.
A proposed park as part of a development within a ROW must not be dedicated, but must remain land with a registered title in the Land Title Office. The area will be subject to our ROW rights and conditions