Skip to content

Paying your bills during the Canada Post service disruption. Learn more

Daisy Lake Discharge

Caution - use flow information below Daisy Lake Dam at your own risk.
To comply with the Provincial Water Act Order, BC Hydro regulates flow releases from Daisy Lake Dam to maintain minimum flows below the Dam and at Water Survey of Canada’s streamflow gauging station at Cheakamus River near Brackendale. Actual flows below Daisy Lake Dam can fluctuate and are subject to change without public notice.

Use of the river or the river foreshore downstream of the Dam and reliance on the posted flow information can be hazardous.

Disclaimer
BC Hydro expressly disclaims any responsibility, liability, warranties or representations, whether express or implied, with respect to this website and the information it contains (“the information”). BC Hydro is not responsible for any reliance on or use of the information contained on or obtained through this site. In no event will BC Hydro, its directors, officers or employees be in any way liable or responsible for any consequence, injury, loss or damage arising in connection with any use of the information. Any person using the information does so entirely and solely at their own risk. BC Hydro accepts no responsibility or liability for the accuracy, availability, suitability, reliability, usability, completeness or timeliness of the information.