Designing the Call
Between February and December 2005, BC Hydro undertook the design of the F2006 Open Call for Power including extensive First Nations, stakeholder and IPP community engagement. The documents posted on this page are a chronicle of the iterative design process for the F2006 Open Call for Power. The CFT issued on December 8, 2005 cancels and supersedes all material published by BC Hydro in connection with First Nations, stakeholder and IPP community engagement relative to this Call, and all prior drafts of the CFT. The documents provided on this page are for general information and background only.
BC Hydro would like to thank all parties that were involved in the development of the Call.
Activities
March 2005 – Regional Information Sessions were held in Prince George, Kamloops, Nanaimo and Vancouver:
March 2005 – Supplier-focused Technical Workshop was held in Vancouver:
March 10 to July, 2005 – Written comments period (April 15, 2005) and ongoing dialogue with stakeholders:
- Read the Summary of Changes in the F2006 Call documents [PDF, 44 KB].
September to October 2005 – BC Hydro reached agreement on the F2006 Call with the 2005 Resource Expenditure and Acquisition Plan registered intervenors pursuant to the BCUC’s Negotiated Settlement Process. The BCUC provided an approval of F2006 Call settlement on October 12, 2005. It concluded the regulatory approvals required prior to issuance of the Call.
October to November 2005 – Written comment period (November 14, 2005) and ongoing dialogue with stakeholders.
Documents
Document | Date Posted |
---|---|
CFT document – black lined [PDF, 204 KB] | December 21, 2005 |
Large Project EPA – black lined [PDF, 519 KB] | December 21, 2005 |
Small Project EPA – black lined [PDF, 414 KB] | December 21, 2005 |
CFT document [PDF, 208 KB] | October 31, 2005 |
Bidder Registration Form [MS Word, 53 KB] | October 31, 2005 |
Seller’s Plant Description Form [MS Word, 43 KB] | October 31, 2005 |
Large Project Tender Form [MS Word, 151 KB] | October 31, 2005 |
Small Project Tender Form [MS Word, 149 KB] | October 31, 2005 |
Large Project Bid Price/Options Form [MS Word, 85 KB] | October 31, 2005 |
Small Project Bid Price/Options Form [MS Word, 56 KB] | October 31, 2005 |
CFT Glossary [PDF, 39 KB] | October 31, 2005 |
CFT Schedule [PDF, 17 KB] | October 31, 2005 |
Project Submission Instructions [PDF, 91 KB] | October 31, 2005 |
Form of Tender Security [PDF, 16 KB] | October 31, 2005 |
GHG Adjustment Table [PDF, 12 KB] | October 31, 2005 |
Form of TerraChoice Letter – Green [PDF, 434 KB] | October 31, 2005 |
BC Hydro Code of Conduct Guidelines Applicable to BC Hydro Contracts [PDF, 20 KB] | October 31, 2005 |
Large Project EPA [PDF, 1.1 MB] | October 31, 2005 |
Small Project EPA [PDF, 949 KB] | October 31, 2005 |
Evaluation Methodology [PDF, 32 KB] | July 15, 2005 |
EPA Term Sheet Large Projects [PDF, 53 KB] | July 15, 2005 |
EPA Term Sheet Small Projects [PDF, 42 KB] | July 15, 2005 |
Updated First Nations and Stakeholder Engagement Plan [PDF, 23 KB] | July 15, 2005 |
Evaluation Methodology TLDC Tenders [PDF, 90 KB] | March 10, 2005 |
Evaluation Methodology SDC Tenders [PDF, 58 KB] | March 10, 2005 |
EPA Term Sheet TLDC Projects [PDF, 95 KB] | March 10, 2005 |
EPA Term Sheet SDC Projects [PDF, 65 KB] | March 10, 2005 |
Non-Technical Overview [PDF, 36 KB] | February 25, 2005 |
First Nations and Stakeholder Engagement Plan [PDF, 30 KB] | February 25, 2005 |