Vendor Information
| BC Hydro is in the final stages of its procurement process for the Smart Metering & Infrastructure Program. Vendors wanting information on the Program should contact Jeremy Stevenson directly by email at Jeremy.stevenson@bchydro.com. Thank you. |
BC Hydro is seeking, through a competitive procurement process, to select qualified suppliers who are capable of leading a diverse group of product and service vendors in the design and delivery of the technical solution for our Smart Metering & Infrastructure program.
The Joint Solution Design procurement process has been launched to identify and select one or more qualified providers to work with BC Hydro on a collaborative basis over the longer term. Service providers will work with BC Hydro to design, develop, build, implement and, potentially, to operate and maintain a sophisticated and highly adaptable smart metering infrastructure. The system must be tailored to BC Hydro's operating environment.
Objectives of the Smart Metering & Infrastructure Program
The key objectives of an installed fully integrated smart metering & infrastructure system are:
- substantially improved collection and utilization of power consumption data (scope, accuracy and retrievability)
- more efficient management of the power distribution grid,
- meaningful support to energy conservation initiatives, including more efficient consumption of power by our customers,
- better detection of power diversions, and
- reduced metering related operating costs over time.
The Process
- BC Hydro is initially proceeding with a Request for Qualification (RFQ) process to pre-qualify and short list a number of proponents.
- Once this short list has been selected, BC Hydro will then initiate a formal Request for Proposal (RFP) process to select a final short list of proponents to proceed to a collaborative and final joint design phase of the process.
- This final group will jointly develop a detailed framework and key components for the project, leading to final detailed proposals in April or May, 2008, with a selected proponent(s) at that time.
Vendors, contact the smart metering team with your procurement questions.